NCR was recently contracted by a high-rise residential building on the Gold Coast. They were experiencing water ingress through the control joints in the basement parking levels. This issue posed not only safety hazards but also caused damage to the paintwork of vehicles parked underground. If left unaddressed, continual water ingress could compromise the integrity of the concrete and reinforcement, potentially leading to further complications down the line.
NCR removed the faulty drip trays, which had been previously installed in a bid to mitigate the excess water issue (not installed by NCR). The NCR team injected the joint with a waterproofing hydrophobic injection grout that fills the voids in the joints, eliminating water ingress and safeguarding the building from future damage.
© Copyright 2021 | All Rights Reserved | National Construction & Remedial | Designed By Search Marketing Specialists