NCR was engaged to reinstate the Waterproofing Membrane to approximately 100 square meters of planter boxes at an apartment complex on Kirra Hill. The scope of work consisted of the removal of existing vegetation and soil, the removal of the original waterproofing membrane and surface prep and the reinstatement of the new waterproofing system.
Hydro-Excavation was utilised to remove the soil and drainage gravel following the removal of all vegetation. NCR engaged experienced sub-contractors to carry out this portion of the works.
Once all vegetation on soil materials were removed the NCR team prepped all surfaces ready to install the Membrane system. All drainage points were cleared of roots, extra scupper holes were drilled into the planters to allow for greater drainage and a floor levelling product was applied to floor to ensure there were no low spots allowing for puddling. Once all the floor wall joints and cracks were routed, sealed and bandaged an Epoxy Primer was applied, followed by 2 Coates of a Class 3 High-Build Polyurethane Waterproofing membrane.
Once NCR had complete the Waterproofing of the all the Planter Boxes, handover of the project to a Landscaping firm took place for the reinstatement of new gardens to round out the projects for our clients.
- 2021 Copyright | All Rights Reserved | National Construction & Remedial | Designed by Search Marketing Specialists